Our Mission and Vision: Safety and Quality First
At Gas Teh, we believe that every gas station must be designed and manufactured according to the highest standards of quality and safety. Our mission is to ensure the reliable and safe operation of every system through expertise, modern technological
The company “GasTeh” from Inđija has signed a contract to participate in the “Gasification of Republika Srpska”
The company "GasTeh" from Inđija has signed a contract to participate in the "Gasification of Republika Srpska" project, which includes the construction of a main gas pipeline from Šepak to Novi Grad. The pipeline will be approximately 500 km long,
Lighting of the “Eternal Flame” at the Park of Friendship in Ušće
On March 24, 2026, the "Eternal Flame" was ceremoniously lit at the Park of Friendship in Ušće to mark the anniversary of the start of the NATO bombing of the FRY. The flame was symbolically ignited at 7:41 PM (19:41), commemorating
The Importance of Licenses and Certificates for Performing Gasification Works
Gas Teh can pride itself on a very high level of competence when it comes to qualified personnel in the field of gas installation design, as well as their implementation in the field. Gas Teh is fully qualified to perform
Holiday Working Hours
“GasTeh” d.o.o. Inđija will be closed in the period from December 28, 2024 to January 8, 2025. The first working day in the new year is Thursday, January 9, 2025.
❄️Merry Christmas and Happy New Year❄️
We wish you a year full of prosperity, innovation and satisfaction - both on a business and personal level.
Gas pipeline Aleksandrovac-Kopaonik-Novi Pazar-Tutin
A new path to energy securityThe newly built gas pipeline Aleksandrovac-Kopaonik-Novi Pazar-Tutin (RG 09-04/2) represents a key infrastructure connection that enables the stable and efficient distribution of natural gas through the central part of Serbia.This project includes a wide range
Gasteh participated in a project worth KM 15 million
Gasification of the Jahorina mountain completedThe Gasteh company successfully participated in the realization of a project worth 15 million convertible marks (KM), which completed the gasification of the Jahorina mountain. The opening of the distribution steel gas pipeline Pale-Jahorina represents
Happy Holidays
We wish you a healthy, peaceful and prosperous coming year!Happy New year and Merry Christmas!
CNG-LNG Presentation
Download documentation GasTeh-CNG-LNG-prezentacijaDownload referenceGASTEHDownload