PROJECT “ETERNAL FIRE “
For the needs of the project “Eternal Fires” on the monument to the liberators of Belgrade, the company “GasTech” from Indjija was instructed by the Republic of Serbia and the Russian Federation to develop a technical solution for burner installation, burner construction, installation and commissioning.
For the installation of “Eternal Fire” was made MROS capacity Q = 4000m3 / h, station KMRS G-4 for natural gas and propane, electrical equipment and automation.
The flame of “Eternal Fire” was transferred from the grave of an unknown hero near the Kremlin walls to the cemetery of the liberators of Belgrade. The solemn ceremony was attended by the Minister of Foreign Affairs of Russia, Sergey Lavrov, and the President of Serbia, Aleksandar Vučić.